Moss/Pell Dorm Addition & Renovations

Project Description

This multi-phase dormitory expansion, renovation, and HVAC upgrade project spanned multiple school years on an active boarding school campus. It comprised the design and construction of an addition that successfully connected three existing dormitory buildings. Existing heating systems were removed in all dorms to make way for new, high efficient systems which included the much needed desire for air condition. These systems all had to be designed and installed in and around the framework of turn of the century masonry construction. In addition to the HVAC upgrades, all carpeting was removed and replaced with LVT. All lighting fixtures were removed and replaced with new LED fixtures throughout.

The addition and reconfiguration added 11 new beds, 1 faculty apartment and a new common space. Additionally, a new gang bathroom was designed and all existing bathrooms were upgraded. Two new outdoor gather spaces were created including the transformation of a seldom used back alley into a new cafe style plaza with hardscaping and landscaping.


DOWNLOAD PROJECT PROFILE

client

St. Andrew's School

location

Middletown, DE

project type

Academic

square footage

32,000 sqft

architect

Nowland Associates, Inc.
st.andrews_mosspell_01
st.andrews_mosspell_13
st.andrews_mosspell_20
st.andrews_mosspell_06
st.andrews_mosspell_14
st.andrews_mosspell_21
st.andrews_mosspell_07
st.andrews_mosspell_16
st.andrews_mosspell_08
st.andrews_mosspell_17
st.andrews_mosspell_22
st.andrews_mosspell_09
st.andrews_mosspell_19